Skip to content

Fixed-scope engagement

Azure Landing Zone Accelerator

A deployed, policy-governed landing zone aligned to the Azure landing zone design areas, with the source handed to your team.

Typical duration
4–6 weeks

What you get

  1. 1Management group hierarchy and subscription topology, deployed
  2. 2Policy baseline assigned at the right scope, with exemptions time-boxed
  3. 3Hub-and-spoke or Virtual WAN network design, built and documented
  4. 4Entra ID role model with PIM configured for privileged roles
  5. 5Terraform or Bicep source for everything above, handed to your team
  6. 6Conformance report against the eight landing zone design areas

Outcome

A platform your teams can deploy into from day one, with governance in place before the first workload arrives.

New build or existing estate

Building a new landing zone and bringing an existing one into line with the design areas are different pieces of work, so the first conversation settles which one you need. Either way the engagement takes four to six weeks, and your team keeps the source.